Update time:2023-04-03 16:10:26 / Views:140
The production process of conductive id silicone wristband keypad is as follows:
Conductive id silicone wristband button production process
A. The design of the drawing
If the customer cannot provide the sample, we can cooperate with the customer to complete the design and production of the drawing for free according to the customers requirements.
Second, open the mold
The mold making is done by the mold maker on our CNC machine according to the designed programming time, some difficult rubber buttons need
The mold can be made only by copper discharge with spark machine. Therefore, the technical content of the production is relatively high and the time is relatively longer; generally, the delivery time is calculated by 10 days for large mold.
The delivery time is usually calculated in 10 days for large molds. When the mold is available, the production will be faster.
Three, color mixing and rubber refining
According to the color number on the international Pantone color card specified by the customer, our company adjusts the color ratio to be accurate, and the color difference is very small.
IV. Approved material
Conductive id silicone wristband buttons are made of environmentally friendly rubber materials, with hardness ranging from 30 degrees to 70 degrees respectively.
Five, on the mold production
After the mold is done well is on the machine production. After the mold is installed, the machine needs to be warmed up, a machine daily output of about 100000pcs of output.
Six, molding quality inspection
After the conductive id silicone wristband button comes out, we need to check the quality of the workshop, mainly to check whether it is in accordance with the specifications of the product, if there is a discrepancy, all will be scrapped, reworked, reworked, etc.
work processing, rework processing, etc.
Seven, since the demolition of the repair side
Conductive id silicone wristband keys will be produced with residual edges, or with batch fronts around, after the inspector of the quality control department has passed the inspection, the product will be sent to the post-processing department for trimming.
The product will be sent to the post-process department for trimming after the inspection by the inspector of the quality control department. (The average number of trimming per person per day is about 30000 to 50000PCS).
Eight, finished product inspection
After trimming, it is finished product. We also need to send the finished product back to the quality control department to check the quality of trimming, whether there are unqualified products, if there will be judged rework processing.
Nine, packaging finished products
After the finished product is inspected by the finished product inspector, the packaging department will pack it according to the customers requirements. Usually each package (5000PCS), and 10 packages per box, or 20 packages per box, completely in accordance with customer requirements for boxing.
X. Checking before sealing the box Packing finished
After the quality control department OQC check the quantity, check the product model and other related quality issues, no questions are asked then sealed boxes and sent to the warehouse waiting to be sent.
Previous:Forming injection id silicone wristband process features
Next:2019 China silicone wristbands status research and development trend